Boatswain’s mate seaman apprentice assigned to Amphibious Construction Battalion 1 prepares U.S. Navy Improved Navy Lighterage System causeway ferry for on-loading during Joint Logistics Over the Shore 2016
Boatswain’s mate seaman apprentice assigned to Amphibious Construction Battalion 1 prepares U.S. Navy Improved Navy Lighterage System causeway ferry for on-loading during Joint Logistics Over the Shore 2016, Naval Magazine Indian Island, Washington, June 13, 2016 (U.S. Air Force/Kenneth W. Norman)

Photo by: Staff Sgt. Kenneth Norman |  VIRIN: 160613-F-QX786-1330.JPG